What is checked before selecting a dimmer?
The schedule records lamp and driver model, wattage, control method, circuit quantity and expected minimum level. Phase-cut, 0/1-10 V and DALI controls are not interchangeable labels.

Kota · Automation
In Kota, we plan smart lighting backwards from the handover test rather than forwards from a device list. The Aerodrome Circle team asks how a user will prove RGB and RGBW works, what manual action remains available when Presence control is unavailable, and which records are needed to maintain Tunable white. Those checks define the survey and commissioning evidence. SmartR Home - Aerodrome Circle still confirms the exact project address before scheduling; the office location tells us nothing about conditions elsewhere in Kota.
The short answer
Lighting automation can switch, dim, tune colour temperature or recall scenes from keys, sensors and schedules. The control protocol and driver must support the requested behaviour. A dimming command cannot fix an incompatible LED driver or a badly grouped circuit.
For the full technical explanation, use our Smart Lighting planning guide.
What the design has to settle
The schedule records lamp and driver model, wattage, control method, circuit quantity and expected minimum level. Phase-cut, 0/1-10 V and DALI controls are not interchangeable labels.
Occupancy and daylight logic should reduce needless operation without stealing control from the room user. Manual overrides need a defined duration and a clear return to automatic mode.
DALI provides digital addressing, grouping, scenes and status queries for compatible lighting equipment. The DALI Alliance documents up to 64 control gear and 64 control devices on a subnet, but actual design…
The luminaire and driver must support colour-temperature control, and the control system needs the matching device type. A warm-looking photograph is not a technical specification.
Need more depth? The complete Smart Lighting guide covers the wider technical context.
Technical relationships
These service-specific diagrams come from the canonical technical record; they do not depict a completed local project.
Decision aid
| Need | Method to investigate | Compatibility check |
|---|---|---|
| Simple on and off | Relay switching | Load current and inrush |
| Local dimming | Compatible phase or analogue control | Driver and low-end performance |
| Addressed groups and feedback | DALI | Certified gear, bus design and gateway |
Local planning
Branch facts are verified. Community observations, when present, are anecdotal and address-specific; they are not presented as citywide facts.
Evidence scope: The two reports conflict, so no frequency claim should be made without utility data and a site-level history.
What this service can and cannot address: SmartR Spaces can define backup runtime, safe restart behaviour and critical-device UPS scope. It cannot correct the utility network.
Local planning questions
Test the promised user outcome for RGB and RGBW, the defined fallback for Presence control and the operator procedure for Tunable white. Results should be recorded against the approved scope, not accepted from a product demonstration.
Share the exact address, expected user actions, existing equipment, known faults and any manuals or drawings. SmartR Home - Aerodrome Circle uses that information to decide what must be inspected.
The design should state the safe or manual fallback, the visible fault indication and the support owner for each critical function. A fallback is verified during commissioning only when it is part of the written scope.
Keep separate results for RGB and RGBW, Lighting scenes, Motion control, Presence control, Dimming, Tunable white. For each one, record the user action, expected response, measured or observed result, fallback check, outstanding defect and person who witnessed acceptance.